In phase three we’re creating the train schedule
-
Goto Edit → Detailed List, select the “Traintype” to create the traintypes we need.
-
Add as many traintypes as you need, a detailed window will give the opportunity to enter peculiarities for each traintype (note: speed limits will be assigned to blocks and switches at this time using default values)
-
In Edit → Detailed List select “TrainSchedule”
-
For each individual schedule, select “Add More” which opens the detailed view of this particular schedule
-
In the sections part of the detailed window (the upper table), add one section and select to edit it (at least one section is required)
-
In the detailed section window, enter information such as from where to enter, to where to exit, train type, length and start time.
-
Repeat the previous two steps for each section you need.
-
If necessary, in the station list (in the lower portion of the detailed schedule view), add a station where you want the train to stop
-
In the detailed station stop window, enter information how you want to handle the stop,
-
Repeat the previous two steps for each stop you need.
-
If you want this schedule to use as a model for other schedules with slightly different parameter (e.g. 10 minutes later) hit the “Duplicate this” button to create a schedule similar as the one you just created (if you want to change other details in the duplicate you need to enter the detailed view for this particular schedule
Your territory is now ready to run!